Skip to main content

Model Railway Layout .Co ,(Railway Scenics). colin@modelrailwaylayout.co.uk, 07826698500 , or 01545 590 830

Artists & Model Makers of the miniature world ,All Types and sizes of models produced, Private & Commercial Commissions

Home Of Model Railway's
00 Gauge Layouts
00 Gauge WWII Leeds Layou
00 gauge london shoreditc
00 Gauge Waterton Layout
00 Gauge Tram Layout
Swedish HO Layout
00 Gauge Chiltern Lines
6ft X 4ft 00 Gauge Little
00 Gauge Scotland Dibley
Up And Over 00 Gauge Layo
00 Gauge Littleton
The Norfolk 00 Gauge
The Southend Lines 00 Gau
FoldDown 00 Gauge Layout
Full Hi Tech DCC 00 Gauge
10x6 DCC 00 Gauge Bradbro
00 Gauge Newcastle Dibley
14x6 00 Gauge To Ireland
Modern Image 00 Gauge
Tayside 1960
Dibley Village Layout 00
6x4 Malven Layout
6ftx4ft 00 Gauge DCC
York Station 00 Gauge
11ftx10ft L 00 Gauge
6x4 Rutland 00 Gauge
12x6 OO Gauge High Tech
00 Gauge Lifting Layout
6x4 00 Wrexham Layout
00 Gauge Somerset Railway
6x4 00 layout with foldin
00 6x4 Brentwood Layout
00 Room Size Layout 12x6
00 Gauge End To End 11 x
00 Basic Kids Layout
Flight Case Layouts
N Gauge Layouts
009 N Gauge Layouts
O Gauge Layouts
0n30 Layouts
Other Gauges
Baseboards
WiFi Camera Locos
SHOP On Line
Dioramas
DCC and DC ReWiring
Layout Lighting
On Line Payments
Layout Planing Service
Usefull Info N Gauge
Layout Rebuilds
N Gauge DCC Fitting to 08
Terms and Conditions
The Wirral Lines 00 Gauge
N gauge 2x4 Little Staine
N Gauge Long Shelf Layout
N Gauge 48x30ins
OO Gauge DCC Layout
N Gauge American Layout 9
4x2 N gauge layout
00 Gauge Shed Layout
N Gauge 6x3x1
N Gauge High Tech Coffee
Large 00 DCC Layout With
3rd Rail Longmoore N Gaug
00Gauge Polytunnel Layout
00 Gauge Dibley Village , Newcastle , UK
 
Another layout based on our popular dibley type of layout
This one is in 00 gauge on approx. 6 x 4 board with legs and storage for the clients rolling stock
 
This is a  very interesting layout ,with a lot going on ,
 with the train in a tunnel and under a bridge etc .
 
 
THIS LAYOUT COMES COMPLETE WITH MOBILE MP3/USB STICK/ MOBILE SOUND SYSTEM FOR CHURCH SOUNDS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Side Trim to board now fitted , and the first tunnel frame being built
 
 
 
 
Station Building Now Built
 
 
Station Platform now being made
 
 
 95% Of Wiring Now Done
 
 
 
 
We have now completed 90% Of The Wiring , and started on the weathering of the track
 
 
 
 
 
 
 
 
 
We have started to lay the inner oval
 
 
Outer oval track laid , we are using the best Fleishmann Track on this layout for reliability and
strength , We first lay cork and then paint it a brown earth colour , before we stick the ready ballasted
track to the cork , this does reduce the noise a little when a train is running .
 
 
 
Not Much to see at the min , but you can see how strong the baseboard will be