Skip to main content

Model Railway Layout .Co ,(Railway Scenics). colin@modelrailwaylayout.co.uk, 07826698500 , or 01545 590 830

Artists & Model Makers of the miniature world ,All Types and sizes of models produced, Private & Commercial Commissions

Home Of Model Railway's
00 Gauge Layouts
Flight Case Layouts
N Gauge Layouts
N Gauge Didcot Power Stat
London 1949 N Gauge
N Gauge 6ftx3ft Track Lay
Welsh Slate Mine Layout
Beaver N Gauge Layout
Folding under the bed n g
7x3 N Gauge Track Only La
N Gauge New Forest Info L
4ft x 2ft N Gauge
5ftx3ft5 N Gauge Layout
N Gauge Templebridge
4ft X 2Ft N Gauge Track L
5ft8x3ft4 N Gauge Layout
Welsh Hills N Gauge Ext L
3x2 N Gauge OZZIE Layout
N Gauge Okehampton
4x3 N Gauge Tunnel Inn La
N Gauge Micro Layouts
8ftx4ft N Gauge
N Gauge Coffee Table
N Gauge Underground
4ftx2ft N Gauge DCC Layou
N Gauge Bennerley Coal
3x2 N Gauge KL Layout
Buckfastleigh N Gauge
6x3 N Gauge No2 Layout
5x2 N Gauge table top lay
Harpenden Lines in N Gaug
N Gauge 49x28
N Gauge 7x4 Track Only La
3x3 N Gauge Track Layout
N Society Module
009 N Gauge Layouts
O Gauge Layouts
0n30 Layouts
Other Gauges
Baseboards
WiFi Camera Locos
SHOP On Line
Dioramas
DCC and DC ReWiring
Layout Lighting
On Line Payments
Layout Planing Service
Usefull Info N Gauge
Layout Rebuilds
N Gauge DCC Fitting to 08
Terms and Conditions
The Wirral Lines 00 Gauge
N gauge 2x4 Little Staine
N Gauge Long Shelf Layout
N Gauge 48x30ins
OO Gauge DCC Layout
N Gauge American Layout 9
4x2 N gauge layout
00 Gauge Shed Layout
N Gauge 6x3x1
N Gauge High Tech Coffee
Large 00 DCC Layout With
3rd Rail Longmoore N Gaug
00Gauge Polytunnel Layout
The Welsh Valleys , Any Time Any Place any Where
This layout is loosely based on a welsh valley with stations and mine workings
 
This layout is approx. 8ft x 4ft and built on  multi levels , It  will be full DCC operation via a Hornby Elite control system
That will be running Railmaster Software  via a Touch Screen Laptop .
You will be able to run 8 trains  that can be tail chasers at any one time , plus shunt a train around
while the others are running .
 
This layout will have boosted sections and power zones for reliability of use .
 
Please see the  track plan below the pictures  ,
Its a very complicated baseboard , as we have to get all the inclines the right angle , please follow the pictures as the build goes forward ;
 
 
PICTURES GO FROM TOP TO BOTTOM ;
 
 
 
We have tested all track s and found that there is one that the locos do not like , so we are going to raise the long upper straights by an  1 ins , this should make
the locos run easier on the slopes
 
 
 
We have now started on the back and the sides , next will be the mountain framework , and then wire and plaster .
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Other end of second level  now being started ,
 
 
 
Track base for level two being fitted
 
 
 
 
 
 
 
Two Circuits Now Laid as above
 
 
 
 
 
 
 
 
 
 
 
Touch screen pc mounted on extra strong baseboard
 
 
 
Extra strong supports  being fitted
 
 
 
Extra bracing now fitted
 
 
 
 
 
 
 
 
The Main level where the main points go , are levels 1/2/3
Levels 4 and 5 are track only no points ,
Levels 1-3 are shown above
 
 
Middle of third level being made
 
 
 
 
base to upper station level now  fitted , awaiting  PC System to fit supports  before doing next level  
 
 
 
 
 
 
 
We Have started to fit the lower running board
 
 
 
 
 
 
 
 
 
More Bracing now being added  21/02/2013
 
 
 
 
 
Frame work started as above ;